You're expected to leave your studio empty, clean, and in good condition for the new tenant.
When terminate your contract, you're required to schedule a pre- and final inspection with the duty manager.
Pre-inspection
The pre-inspection takes place 2 weeks before your departure. During the pre-inspection, the duty manager will assess your studio for any defects and provide you with a list of necessary resolutions before the final inspection. Your studio does not need to be empty yet.
Final inspection
The final inspection takes place on a weekday (Monday–Friday) on or before the last day of your contract, after which you hand in your keys. If your contract ends on a Saturday, please schedule the final inspection during the preceding week.
If any defects are identified during the final inspection, you will be responsible for covering the repair costs. If the defects are so serious that the studio cannot be rented out immediately after you leave, you will be charged for the number of days the studio is vacant.
For more information on how to leave your studio, check the 'Terminating contract' tab on the FAQ page of your location.